GEROtherm® DUPLEX - Heating/cooling system W22 and W23 Zurich Airport depot
Near slope area on the green area are placed the geothermal probes for energy generation of the new heating / cooling supply. Each geothermal probe (double U-pipe) can be individually shut off and throttled at the geothermal probe distributor. The geothermal probe distributors are installed in a buried shaft next to the geothermal probe field.
The supply lines from the borehole heat exchangers to the distributor are installed in trenches. The distribution shaft is installed stably on a separate concrete foundation. The dimensions of the distribution shaft are approx. 5m in length and 2.6m in depth. After connecting the supply lines, a pressure distribution plate was concreted over the distribution manhole.
The penetrations must be tight up to a water pressure of 10 mWs.
Each probe circuit is monitored by special temperature sensors. This allows a change in temperature to be detected quickly. The distribution shaft is equipped with lighting with external power supply. Furthermore, a CO2 warning light was also installed at the manhole entrance.
Zurich Airport
Heating/Cooling system
Werkhof W22 und W23
CH-8058 Zürich-Flughafen
The supply lines from the borehole heat exchangers to the distributor are installed in trenches. The distribution shaft is installed stably on a separate concrete foundation. The dimensions of the distribution shaft are approx. 5m in length and 2.6m in depth. After connecting the supply lines, a pressure distribution plate was concreted over the distribution manhole.
The penetrations must be tight up to a water pressure of 10 mWs.
Each probe circuit is monitored by special temperature sensors. This allows a change in temperature to be detected quickly. The distribution shaft is equipped with lighting with external power supply. Furthermore, a CO2 warning light was also installed at the manhole entrance.
Construction:
Zurich Airport
Heating/Cooling system
Werkhof W22 und W23
CH-8058 Zürich-Flughafen
Used Products:
- 34 GEROtherm® Geothermal probes PE100-RC, PN 16, de 40mm length 250m
- 1 shaft type 3 with 34 connections.
Including lighting and CO2 warning light - 2 Collectors/Distributors SAVE 180
Each with 34 outlets equipped with ball valves, line regulating valves and temperature sensor - 34 grouting tubes PE-HD de 25mm Länge 252m
- 34 weights EWS UL40 12,5kg
- 3400m GEROfit-R casing pipe PE 100 RC
De 50x 4.6mmS5PN16 Including all necessary fittings