GEROtherm® FLUX – Banque Pictet, Geneva
To pursue the development of its activities, the Pictet Group has decided to construct an avant-garde building at the heart of the major Praille Acacias Vernets urban development project in Geneva.
The new building will play a central role in the future Campus Pictet de Rochemont. Equipped with the most modern technologies, it will also represent a model of environmental integration in an urban environment.
The Campus Pictet de Rochemont aims to become one of the most emblematic building complexes of the Praille Acacias Vernets (PAV) project. Located at the heart of Geneva, the PAV is a dynamic area combining industrial, commercial and residential complexes.
Campus Pictet de Rochemont is scheduled to open in 2025.
CONSTRUKTION
Pictet Group
Route des Acacias 60
1211 Genf
USED PRODUCTS
TECHNICAL SPECIFICATIONS
Product
GEROtherm® FLUX
Pipe Type
GEROtherm® connection pipes PE100-RC, PN 16, de 50mm
The new building will play a central role in the future Campus Pictet de Rochemont. Equipped with the most modern technologies, it will also represent a model of environmental integration in an urban environment.
The Campus Pictet de Rochemont aims to become one of the most emblematic building complexes of the Praille Acacias Vernets (PAV) project. Located at the heart of Geneva, the PAV is a dynamic area combining industrial, commercial and residential complexes.
Campus Pictet de Rochemont is scheduled to open in 2025.
CONSTRUKTION
Pictet Group
Route des Acacias 60
1211 Genf
USED PRODUCTS
- Phase 1 47 geothermal probes GEROtherm® FLUX PE100-RC, up to PN 32, L= 360m
(October 2021)
- Phase 1 52 geothermal probes GEROtherm® FLUX PE100-RC, up to PN 32, L= 360m
(May 2022)
- GEROtherm® connection pipes PE100-RC, PN 16, de 50mm
TECHNICAL SPECIFICATIONS
Product
GEROtherm® FLUX
Pipe Type
GEROtherm® connection pipes PE100-RC, PN 16, de 50mm